Summary With No Feasible Solutions

Scroll Prev Top Next More

HOMER Logo

shots_navigating_results_icon


The image provided below is an example of how the summary tab looks if your model produces no feasible solutions.

no feasible

 

If there are no feasible solutions, view some of the possible tips and considerations listed below.

Check the calculation report to get information on how many simulations were run, and why they were deemed infeasible

No feasible solutions

Look through the model for constraints that might have filtered out the simulations as infeasible. Some of the reasons could be:

a. Load not served during outages due to insufficient power supply from other resources such as solar/battery/wind/generators
b. Penalties on emissions, as shown in Emissions below

 

emissions

 c. A high minimum renewable fraction in your Project Economics

constarints